Noise Control for Battery Storage Systems: Seamlessly from Site Assessment to Noise Immission Report

When planning a battery storage system, noise will become an issue sooner or later. The key question is when – and how smoothly the process proceeds from there.

In some projects, noise exposure is only assessed once the site and layout have already been largely finalised. Any necessary adjustments can then quickly become costly and put pressure on the project schedule.

Other project teams consider noise at an early stage of the planning process, enabling them to identify critical configurations in good time. Yet even then, there is often a gap: as soon as a reliable noise immission report is required for approval or further planning, the digital process comes to an end.

Why the transition to a noise immission report has often been difficult

Until now, the handover to specialist planning has usually involved a break in the process: project data that has already been captured internally in one or more planning tools has to be compiled manually for the enquiry. As a result, valuable days are lost to coordination and data transfer before the actual noise immission assessment process can begin.

With dBEL.Energy, our cloud-based platform for the acoustic assessment of energy projects, project teams can assess the noise situation at a battery storage system site at an early stage of planning – reliably, within minutes and without any prior knowledge of acoustics. Potential conflicts become apparent and can be taken into account when planning the site and layout.

>> Find out more about how site assessment with dBEL.Energy works here

Background

What is the difference between a noise screening and a noise immission report for battery storage systems?

A noise screening provides a reliable assessment at an early stage of whether acoustic conflicts are to be expected at the selected site – before cost-intensive planning and construction phases begin. For this purpose, dBEL.Energy uses recognised calculation methods from specialist planning and incorporates relevant environmental data into the assessment. If relevant noise reference values are likely to be exceeded, the site or system layout can be adjusted at an early stage. A noise immission report, on the other hand, is a detailed technical assessment carried out by a qualified specialist planner and can serve as evidence in the approval procedure.

The screening therefore does not replace a required noise immission report. Rather, it provides a solid basis for one.

>> Further background information on noise immission reports for battery storage systems

The second step: Seamlessly from screening to specialist planning

Much of the information required for specialist planning is already available after the screening. If a noise immission report is required at a later stage, this data can be reused directly in dBEL.Energy for an enquiry. To ensure a seamless workflow, we work closely with the acoustics experts at our sister company Wölfel Engineering. Wölfel has been active in the fields of acoustics, vibrations and immission control for more than 50 years and supports projects from the initial technical assessment through to robust documentation for the approval procedure.

Background

What data is required for a noise immission report for a battery storage system?

For a noise immission report, information on the site and the planned system layout is required first – such as the positions of the individual components and the distances to buildings and other relevant immission locations. In addition, information on the relevant noise sources is required, for example inverters, transformers or cooling and ventilation systems, including their sound power levels and operating conditions.

For the propagation calculation, information about the surroundings is also relevant, such as terrain, buildings and other factors that influence sound propagation. Furthermore, the relevant immission locations and reference values as well as any existing commercial noise exposure are taken into account. Depending on the project, technical documentation from manufacturers, requirements specified by the authorities or other requirements arising from the approval procedure are also included in the assessment.

This is how the workflow works in three steps:

  1. Request specialist planning directly from your project
    The enquiry is initiated without leaving the existing dBEL.Energy project – no separate form and no need to search for the right contact. You select the required service – a noise immission report or a technical statement – and specify the required timeframe. If necessary, you can add further technical documentation or requirements specified by the authorities. All information, including the existing dBEL report, is then submitted together. The project team does not need to compile information that has already been captured or prepare it for the specialist planner again.
     
  2. Know how to proceed within 48 hours
    The specialist planner at Wölfel Engineering reviews the enquiry and provides an initial response within a maximum of 48 hours. If all the required information is available, you will receive a corresponding quotation straight away. This means you will quickly know when specialist planning can begin.
     
  3. Receive the technical statement or noise immission report
    Once commissioned, Wölfel Engineering continues working directly on the basis of the existing project data, rather than first having to reconstruct the initial situation from emails and descriptions. The acoustics experts supplement and validate the input data, perform the required sound propagation calculations and assess the results against the requirements applicable to the project.

What this means in practice for your projects: Save time, reduce risks

For project developers, the seamless process offers four key advantages:

  • Planning risks become apparent at an early stage – critical configurations are identified during the site assessment rather than only during the approval procedure. The assessment is based on a technology that has already been used in more than 20,000 projects.
  • No duplicate data entry – the layout and noise sources are taken directly from the existing project instead of having to be entered again. This reduces both the effort involved and the risk of data transfer errors.
  • Around 1 hour less coordination effort per enquiry – there is no need for follow-up questions about the project description, as all relevant data is already available.
  • Seamless process – findings from the early site assessment can be incorporated directly into further planning and assessment without any disruption or change of system.

 

Would you like to try dBEL.Energy and the seamless process?

Background

Wölfel Engineering and dBEL: Acoustics expertise from a single source

dBEL and Wölfel Engineering are sister companies within the Wölfel Group. This enables digital site assessment and subsequent specialist planning to be seamlessly integrated with minimal effort.

For battery storage projects, the experienced team provides reliable noise immission forecasts, legally compliant noise immission reports and advice on specialist and technical questions. If acoustic conflicts become apparent, the experts also develop customised noise protection solutions.

>> Learn more about Wölfel Engineering’s acoustics services